Penerapan Waktu Pada Proyek Pembangunan Gedung Isolasi RSUD Meuraxa Kota Banda Aceh Menggunakan Metode Critical Path Method (CPM)

Muhammad Jauhar Izzaki, Muhammad Ridha, Amalia Effendy

Abstract


This research was conducted using the Critical Path Method (CPM) with the help of software in the form of Microsoft Excel and Microsoft Project. The purpose of this study was to determine the critical path and the non-critical path and to determine the duration of the project after being calculated using the Critical Path Method (CPM) in the construction work of the isolation room at Meuraxa Hospital, Banda Aceh City. Therefore, in this study, the authors conducted a study of project scheduling data for the Isolation Building Construction of the Meuraxa Hospital in Banda Aceh City, where the overall scheduling used the Gantt Chart method. In this study, only RAB and S-curve data were needed. The results of the analysis using the Critical Path Method (CPM) method obtained a total duration of 151 days from the initial total duration of 161 days of work activities. The difference in decreasing day duration is 10 days or 0.94%. And found 23 jobs on the critical path from a total of 42 jobs. The total initial wage cost with a normal duration of 161 days is IDR 728,332,768.20 while the total cost with a duration after using the Critical Path Method (CPM) method is obtained 151 days with a total employee wage cost of IDR 683,094,708.06. Then there is a wage efficiency of 6.21% or Rp. 45,238,060.14 of the total cost of workers' wages of Rp. 728,332,768.20. In implementing a project, it is necessary to plan activities carefully to avoid delays in carrying out the project.

Keywords


CPM, duration, critical, efficiency.

Full Text:

PDF

References


Aulia, M. Z. (2021). Penerapan Metode CPM (critical path method) Pada Proyek Konstruksi Pembangunan Bendungan Lau Simeme Paket II Kab. Deli Serdang. UMSU.

Fedrikson, F., Jamal, M., & Abdi, F. N. (2019). Optimalisasi Biaya Dan Waktu Pelaksanaan Proyek Pada Proyek Dengan Metode Least Cost Analysis. Teknologi Sipil, 3(1), 21–28.

Jasman, Z. F. (2022). Penerapan Analisa Manajemen Waktu Dengan Metode Cpm Dan Pert Pada Proyek Pembangunan Puskesmas Loa Pari Di Kecamatan Tenggarong. Kurva Mahasiswa, 12(3), 18–35.

Larasati, D. A., Sutopo, W., & others. (2020). Analisis Efektivitas Jadwal Proyek Implementasi Software dengan Critical Path Method: Studi Kasus. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6(1), 55–64.

Rachman, D. N., & Iswendra, I. (2018). Analisis Penerapan Manajemen Waktu Pada Rencana Proyek Pembangunan Gedung Cobalt Dan Linac Rsmh Palembang Dengan Menggunakan Metode CPM. Jurnal Teknik Sipil, 8(2), 81–91

Rian Aprilyanti, R. A. (2019). Halaman Sampul Analisa Kinerja Waktu Pada Proyek Pembangunan Kedungmaling Kabupaten Mojokerto Dengan Menggunakan Metode Critical Path Method (CPM) Dan Precedence Diagram Method (PDM). Universitas Islam Majapahit Mojokerto.

Sa’adah, N., Rijanto, T., & others. (2021). Evaluasi Proyek Pembangunan Gedung Stroke Center (Paviliun Flamboyan) Menggunakan Metode Critical Path Method (CPM) Dan Crashing. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 3(2), 55–62.

Suhendra, S., Dwiretnani, A., & Endika, E. (2019). Optimasi Alat Berat pada Pemindahan Tanah Mekanis (Studi Kasus Penyediaan Timbunan Tanah Pilihan Pada Pekerjaan Peningkatan Akses Jaringan Pipa Air Bersih Kabupaten Tanjung Jabung Barat, Booster Senyerang). Jurnal Talenta Sipil, 2(1), 8–15.

Tiara, W., & Marwan, M. (2021). Penjadwalan Proyek Pembangunan Gedung Kantor Notaris Menggunakan Metode CPM Dan PERT. IESM Journal Industrial Engineering System and Management Journal, 1(2), 92–103.

Ulfa, S., & Suhendar, E. (2021). Implementasi Metode Critical Path Method Pada Proyek Synthesis Residence Kemang. Jurnal Optimasi Teknik Industri (JOTI), 3(1).

Wasito, W., & Syaikhudin, A. Y. (2020). Studi Penerapan Critical Path Metode (Cpm) Pada Proyek Pembangunan Pabrik Semen Rembang PT Semen Gresik. J-Macc: Journal of Management and Accounting, 3(2), 74–91.

Yusdiana, E. D., & Satyawisudarini, I. (2018). Penerapan metode PERT dan CPM dalam pelaksanaan proyek pembangunan jalan paving untuk mencapai efektivitas waktu penyelesaian proyek. Almana: Jurnal Manajemen Dan Bisnis, 2(3), 20




DOI: https://doi.org/10.30601/jtsu.v9i2.4013

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Amalia Effendy

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Teknik Sipil Unaya


Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019