Analisis Anggaran Biaya dan Waktu Optimal dengan Metode Least Cost Sheduling

Muhammad Ridha, Ulil Mustika Musakkir

Abstract


Cost Scheduling aims to shorten project completion time and look for optimal project schedules using direct, indirect and minimal total costs. This research was conducted on the rehabilitation project of the Lawe alas sub-district office in the Southeast Aceh sub-district. Least. This research was conducted to determine the suitability of physical work in the field with the planning schedule, to find out the optimum amount of time in the project and to know the comparison between the normal costs and costs after the project has accelerated. The calculation results show the normal project implementation time is 182 days with a normal charge of Rp. 160.151.592,33 by adding 1 hour additional working hours hence can speed up time as much as 12 days with additional cost equal to Rp. 2,564,736.09. By adding 2 hours additional hours working hours can accelerate as much as 23 days with an additional cost of Rp. 33.460.241,48. By adding 3 hours additional hours working hours can accelerate as much as 33 days with an additional charge of Rp. 64.355.746,88. By adding 4 hours additional hours working hours can accelerate as much as 42 days with an additional charge of Rp. 95.251.252,27..

Full Text:

PDF

References


Ahuja, Hira, N. Project Management Techniques in Planning and Controlling Construction Projects. Wiley. Toronto.

Dipohusodo, Istimawan. (1996). Manajemen Proyek dan Konstruksi. Jilid 1&2. Yogyakarta: Kanisius.

Ervianto, W.I. (2002). Manajemen Proyek Konstruksi. Yogyakarta: Andi.

Ervianto, W.I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi.

Husen, Abrar. (2008). Manajemen Proyek. Yogyakarta: Andi.

Soeharto, Iman. (1995). Manajemen Proyek: Dari Konseptual Sampai Operasional. Jilid 1. Jakarta: Erlangga.

Soeharto, Iman. (1998). Manajemen Proyek: Dari Konseptual Sampai Operasional Jilid 2. Jakarta: Erlangga.

Adianto, L.D Yohannes, dkk. (2006). Analisis Biaya dan Waktu Oprimal Pada Proyek Ruko Paskal Hypersquare dengan Least Cost Scheduling. Jurusan Teknik Sipil Universitas Katolik Parahyangan. Bandung.

Frederika, Ariany. (2010). Analisis Percepatan Dengan Menambah Jam Kerja Optimum Pada Proyek Kontruksi (Studi Kasus: Proyek Pembangunan Super Villa, Peti Tenget-Badung). Jurusan Teknik Sipil Universitas Udayana. Denpasar.




DOI: https://doi.org/10.30601/jtsu.v4i2.35

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 Jurnal Teknik Sipil Unaya



Jurnal Teknik Sipil Unaya


Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019