Identifikasi Potensi Pembangkit Listrik Tenaga Hybrid (PLTH) Angin dan Surya di Kabupaten Aceh Besar

Fadhli Fadhli, Ichsan Syahputra

Abstract


The Wind and Solar Hybrid Power Plant (PLTH) research is expected to be able to contribute to assist the development of electricity supply in Aceh and gradually reduce and substitute the use of fossil energy. Hybrid Power Plant (PLTH) by combining wind energy and solar energy is a sustainable electricity supply technology that is increasingly popular because it is environmentally friendly and is not much constrained by land conversion. This research by measuring wind speed and solar radiation was carried out at selected locations in Aceh Besar District namely Lhoksedu, Lampuuk, Lambadeuk and Krueng Raya. The Lhokseudu location has a maximum wind speed of 6.3 m / sec and an average wind speed of 1 m / sec while solar radiation is a maximum of 764.90 W / m2, an average of 467.87 W / m2 and a minimum of 155.40 W / m2. Location Lampuuk maximum wind speed of 7.6 m / sec and average wind speed of 1.1 m / sec while maximum solar radiation is 1193 W / m2, average 678.74 W / m2 and minimum 30.20 W / m2. The Lambadeuk location has a maximum wind speed of 13 m / sec and an average wind speed of 1.3 m / sec while maximum solar radiation is 1589 W / m2, an average of 626.01 W / m2 and a minimum of 38.50 W / m2. The location of Krueng Raya is a maximum wind speed of 9.4 m / sec and an average wind speed of 3.1 m / sec while solar radiation is a maximum of 1019 W / m2, an average of 811.65 W / m2 and a minimum of 493.50 W / m2. Based on the results of data collection and analysis of wind speed and solar radiation that have been carried out including using secondary data / wind speed data from Blang Bintang BMKG Station at Sultan Iskandar Muda Airport and BMKG Indrapuri Station, it can be concluded that the more potential for PLTH development is the location Lambadeuk and Krueng Raya.

Full Text:

PDF

References


Badan Pusat Statistik. (2018). Aceh Besar Dalam Angka, Kabupaten Aceh Besar.

ESDM. (2007) www.esdm.go.id. [Online]. Diakses dari: http://www.esdm.go.id/batubara/doc_download/714-blue-printpengelolaan-energi-nasional-pen.html.

Kementerian Energi dan Sumber Daya Mineral. (2015). Buku Informasi Energi. Jakarta.

Peraturan Menteri ESDM No. 04 Tahun 2012 Tentang Harga Pembelian Tenaga Listrik Oleh Pt Pln (Persero) Dari Pembangkit Tenaga Listrik Yang Menggunakan Energi Terbarukan Skala Kecil Dan Menengah Atau Kelebihan Tenaga Listrik.

Potensi Angin. (30 Maret 2007). www.esdm.go.id. [Online]. Diakses dari: http://www.djlpe.esdm.go.id/modules.php?_act=detail⊂=news_me dia&news_id=1527.




DOI: https://doi.org/10.30601/jtsu.v5i2.287

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 Jurnal Teknik Sipil Unaya



Jurnal Teknik Sipil Unaya


Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019