Analisa Produktivitas Tenaga Kerja Pada Pekerjaaan Rangka Atap

Mulyadi Mulyadi, Hasnawati Hasnawati, Muhammad Ridha

Abstract


Productivity is an important factor in determining the success of a construction work. Increased productivity will reduce work time, and that means it will reduce costs. In general, the value of productivity is determined by the factor of the volume of work, implementation time, and the number of workers. In order to get the job done well, a planning effort is needed by paying attention to these factors. For this reason, this study was conducted to determine the value of productivity in one component of building construction work, namely lightweight steel roof truss work. The object of study was the work of lightweight steel roof truss 4 (four) project sites, namely the 4 x 25 Shop Houses Construction Project in Meulaboh, West Aceh, the Building of the Rector & Administration Bureau Building of STKIP Bina Bangsa Getsempena Banda Aceh, the Construction of the Getsempena Lhoksukon North Aceh STIKES Building and the Construction of North Aceh RIKI STIKes Building, Bina Nusantara Idi, East Aceh. The roof truss material used is type C Truss 75 0.75 Thickness. The volume of roof truss work is planned to be 2022.38 m2. The study was conducted through field observations by directly recording the volume of work, the duration of each stage of work, and the number of workers involved. The results of the analysis show that the productivity value for roof truss works is obtained by an average of 2,062 m2 / hour or 16,499 m2 / day. In the implementation of roof truss work, the amount of labor used is the same in all segments, so the value of productivity tends to be determined by the magnitude of the ratio between the volume of work and the effective time of implementation. Thus, if the amount of work volume can be completed in a shorter time then the value of productivity will increase

Full Text:

PDF

References


Hansen. (2009). Menghitung Produktivitas Pekerja, https://hansenkammer.wordpress.com/2009/08/21/menghitung-produktivitas-pekerja/, 15 Mei 2019 12.57 WIB

Kementerian Pekerjaan Umum. (2007). Peraturan Menteri Pekerjaan Umum Nomor : No.45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara.

Kementerian Pekerjaan Umum. (2013). Peraturan Menteri Pekerjaan Umum Nomor : No.11/PRT/M/2013 Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum.

Kusjuliadi, D. (2007). Ragam Bentuk dan Perawatan Atap. Jakarta: Penebar Swadaya.

Mubarak., Fachrurrazi., Malahayati, Nurul., dan Ansari, Muhammad Gazi. (2015). Kajian Produktivitas Pada Pekerjaan Penutup Atap, Banda Aceh. Prosiding Seminar Nasional-Jurusan Teknik Sipil Unsyiah-Peran Inovasi Rekayasa Konstruk dalam Pembangunan Aceh yang Berkelanjutan.

Nurwibowo, Aditya. (2014). Analisis Produltivitas Pada Pemasangan Konstruksi Rangka Atap Baja Ringan. Fakultas Sipil dan Perencanaan Universitas Islam Indonesia, Yogyakarta.

Soedrajat, S. (1984). Analisa Anggaran Pelaksanaan. Bandung: Nova.

Tisnawan, Rahmat, Hadi, Saiful. (2016). Analisa Produktivitas Tenaga Kerja dan Biaya Pada Pekerjaan Pasangan Rangka Atap Pada Pembangunan Perumahan Panam View Tipe 48, Universitas Abdurrab. Jurnal Teknik Sipil Universitas Abdurrab. 1(2).




DOI: https://doi.org/10.30601/jtsu.v5i2.285

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 Jurnal Teknik Sipil Unaya



Jurnal Teknik Sipil Unaya


Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019